Modern Australian
The Times

Vingroup Launches Hanoi – Quang Ninh High-Speed Railway Project

QUANG NINH, VIETNAM - Media OutReach Newswire - 12 April 2026 - The People's Committee of Quang Ninh Province, in coordination with Vingroup and the People's Committees of Hanoi, Hai Phong, and Bac Ninh, today officially launches the Hanoi Quang Ninh high-speed railway project, which is expected to be completed by the end of 2028.

With a maximum design speed of up to 350 km/h, the project will shorten travel time between the two localities by five to seven times, to approximately 23 minutes.

Rendering of Ha Long terminal station at Vinhomes Global Gate Ha Long urban area (Quang Ninh).
Rendering of Ha Long terminal station at Vinhomes Global Gate Ha Long urban area (Quang Ninh).

The launch ceremony for the Hanoi Quang Ninh high-speed railway project is part of a series of activities celebrating the successful election of deputies to the 16th National Assembly and People's Councils at all levels for the 2026-2031 term, aimed at creating momentum for a new phase of development.

The event was attended by Mr. Le Minh Hung, Politburo Member and Prime Minister; Mr. Pham Minh Chinh, former Politburo Member and former Prime Minister; Mr. Pham Gia Tuc, Politburo Member and Standing Deputy Prime Minister; Mr. Nguyen Hoa Binh, former Politburo Member and former Standing Deputy Prime Minister; Mr. Luong Tam Quang, Politburo Member and Minister of Public Security; along with leaders of central ministries, agencies, and localities.

The Hanoi Quang Ninh high-speed railway project is developed by VinSpeed High-Speed Railway Investment and Development Joint Stock Company, a member of Vingroup, with a total investment of over VND 147 trillion, equivalent to more than USD 5.6 billion, excluding land clearance costs.

The project spans four localities: Hanoi, Bac Ninh, Hai Phong, and Quang Ninh, with a total length of 120.2 km. It is designed as a double-track, standard-gauge (1,435 mm), fully electrified railway, with a maximum operating speed of up to 350 km/h. The section passing through Hanoi will operate at a maximum speed of 120 km/h. The project is expected to deploy the latest generation of high-speed trains, alongside world-class signaling, communications, and equipment systems supplied by Siemens Mobility (Germany), with a roadmap for technology transfer to VinSpeed during operations.

The starting point of the line will be at Co Loa Station, located within the Vietnam National Exhibition Center, Vinhomes Global Gate Hanoi urban area. The terminal station will be Ha Long Station, located within Globe Forest Park, Vinhomes Global Gate Ha Long, Quang Ninh. The route will include three intermediate stations at Gia Binh (Bac Ninh), Ninh Xa (Hai Phong), and Yen Tu (Quang Ninh), as well as one depot located at the Ha Long terminal station.

Prime Minister Le Minh Hung and delegates perform the project launch ceremony for the Hanoi – Quang Ninh high-speed railway project.
Prime Minister Le Minh Hung and delegates perform the project launch ceremony for the Hanoi – Quang Ninh high-speed railway project.

According to plan, the project is expected to be completed and enter commercial operation in 2028, reducing travel time from Hanoi to Quang Ninh by five to seven times, from over two hours to approximately 23 minutes.

Speaking at the ceremony, Mr. Bui Van Khang, Deputy Secretary of the Provincial Party Committee and Chairman of the People's Committee of Quang Ninh Province, stated: "The Hanoi Quang Ninh high-speed railway is a mega-project that carries significant expectations. It demonstrates the capacity and strong commitment of the investor, and stands as clear evidence of the increasingly deep participation of the private sector in critical national infrastructure. We are committed to continuing close coordination with central ministries and the investor throughout project implementation; proactively addressing any arising challenges; and ensuring land clearance, resettlement, and all necessary conditions are in place for the project to be delivered on schedule and to the highest quality standards."

As the first inter-regional high-speed railway project to be implemented in Vietnam, the Hanoi –Quang Ninh line is expected to create strong momentum for the Northern Key Economic Region, while marking a significant step toward a new era of accelerated development, contributing to the realization of the Party's and Government's determination to enhance national competitiveness.

Representing the investor, Mr. Nguyen Viet Quang, Vice Chairman and Chief Executive Officer of Vingroup, shared: "Today's launch ceremony for the Hanoi Quang Ninh high-speed railway affirms Vingroup's strong commitment to contributing to infrastructure development, steadily building a modern, internationally-standardized transport infrastructure system, thereby supporting socio-economic growth and improving the quality of life for the Vietnamese people."

Mr. Michael Peter, Global CEO of Siemens Mobility, shared: "We are committed to bring to Vietnam the world's most advanced, safest, and most efficient high-speed rail system with proven track record across the globe. Every day, our trains run around one million kilometers, three times the distance to the moon, with an unbeaten safety record. Each train is developed fully digitally, delivering maximum energy efficiency and a superior passenger experience. Siemens is committed to deliver a close and sustainable partnership with Vingroup, where we envision a true win-win partnership, including an extensive technology transfer program. We will build and service these trains together, creating a new railway ecosystem in Vietnam."

The Hanoi Quang Ninh high-speed railway is the second project undertaken by VinSpeed. In December 2025, VinSpeed officially broke ground of the Ben Thanh – Can Gio railway line in Ho Chi Minh City, which is also expected to be completed in the fourth quarter of 2028.

The consecutive rollout of two high-speed railway projects in both the northern and southern regions not only affirms VinSpeed's strong execution capabilities, but also lays the foundation for the development of a multi-billion-dollar railway and supporting industries ecosystem, contributing to elevating Vietnam's position and competitiveness on the global stage.


Hashtag: #Vingroup #VinSpeed

The issuer is solely responsible for the content of this announcement.

Your Baby's First Year: A Local Guide to Feeding, Sleep, and When to Get Extra Support

Ask ten parents in a Brisbane mothers' group how their baby is feeding or sleeping, and expect ten different answers.  Someone's baby sleeps throu...

Kitchen and Laundry Makeover Ideas That Don't Require a Full Renovation

Full kitchen renos are expensive — and most people don't actually need one.  They need the kitchen to stop looking like it's stuck in 2009, or t...

How Technology Is Reshaping the Modern Australian Commercial Kitchen

The commercial kitchen has always been shaped by technology. Refrigeration changed how ingredients could be stored, modern ventilation transformed k...

The Number on a Roller Blind Fabric That Nobody Explains

Somewhere in the fabric book, next to the colour name, there is a percentage. Three per cent. Five per cent. Ten per cent. Nobody explains it, most c...

What’s Trending in Men’s Jewellery This Father’s Day!

Finding a Father’s Day gift that feels personal, stylish and genuinely wearable is not always easy. While socks and novelty mugs have traditionall...

Road Signs: Understanding Their Role in Clear and Effective Signage

Effective signage and display hardware can help businesses communicate information, promote products and organise customer or visitor movement. Road...

Bottle Label Printing: Key Factors to Consider Before Your Next Packaging Run

Effective packaging begins with understanding the product, bottle material, artwork and production requirements when planning bottle label printing. H...

Planning a Long-Distance Move With Interstate Movers Melbourne

Moving between states involves more planning than a typical local relocation. Along with packing and transporting household belongings, you need to...

Understanding the Role of an I/O Controller in Industrial Automation

Modern industrial systems depend on accurate communication between sensors, machines and control systems. An I/O controller can help manage this commu...

How the Right Mining Hose Supports Demanding Operations

Mining environments place considerable demands on equipment used for material transfer, water management and processing. Hoses operating in these co...

Simple Ideas for Making Social Gatherings More Memorable

We have all been to those parties where everyone just stands around the kitchen island, staring at their phones, waiting for someone else to make a mo...

Outdoor Wall Lights: Improving Exterior Lighting Around Your Home

Lighting can influence how a room looks, feels and functions, so the right fitting should be selected according to both appearance and practical req...

Commercial Office Cleaning: Combining Routine Office Cleaning With Melbourne Service

Keeping a workplace clean requires a service that can accommodate everyday tasks as well as the particular needs of the business. Professional comme...

Caravan Sales in Queensland: How to Find the Right Caravan for Sale QLD

Caravan ownership is about more than having somewhere to sleep while travelling. For many Queenslanders, it is one of the best ways to explore regio...

What Sir Walter Buffalo Turf Actually Costs in 2026 (And Why Quotes Vary So Much)

Two quotes landed on a Hills District homeowner's kitchen table last spring for the exact same 80-square-metre backyard. One said $12 a metre. The o...

Nearly 1,300 NSW Hospital Beds Are Occupied By People Who Are Ready To Go Home

1,276 people in NSW hospitals have been medically cleared for discharge but remain in hospital because they're still waiting for NDIS or aged care sup...

National Survey Launched to Measure Operational Impacts of Federal NDIS Policy Reforms

The effects of recent NDIS reforms are beginning to move beyond policy papers and into day to day service delivery. A new national survey is asking ...

Beyond the Nappy Cake: Baby Shower Gifts That Get Used

What new Australian parents unwrap, keep, and quietly thank you for months later. Six weeks after my daughter was born, I did an audit of the baby sh...